Project São Gabriel do Oeste/MS – 90 t/h

Images of the Proyecto

Description of the project

– 90 t/h for swine– Exclusive silos for different qualities of the same cereal;

– Transilation in the bran silos to avoid product compaction;

– Fully bolted tubular structures and floors,

– Mills manufactured with raw materials of high resistance without similarity in the market

– Shipment prepared for Line Cleaning Batch

– Dosing system dimensioned to reduce the time lost in the process

– Duplicate flow to ensure capacity and avoid cross contamination